PNE Polska
Regionally rooted with a strong global network
PNE Polska has been developing and operating wind and solar projects since 2000. Backed by the PNE Group, our team delivers sustainable energy with local impact.

Who we are
Contributing to the energy revolution
PNE Polska is one of the most experienced developers of renewable energy investments in the country.
We have been present in Poland since 2000, initially as WKN Polska in cooperation with the local company AOS, and since 2008 as Sevivon. Since 2025, we operate as the Polish branch of the global PNE brand under the name PNE Polska. So far, we have built 139 turbines in Poland with a total capacity of almost 400 MW, including one of the largest wind farms in our country: the Jasna project, consisting of 39 turbines with a total capacity of 132 MW.
By 2030, we plan to develop wind projects with a total capacity of 2.1 GW. We are also developing over 40 photovoltaic projects with a total area of 1000 ha and an installed capacity of 800 MW.

Learn about our history
PNE Polska milestones
Part of global PNE Group
Strong network with great experience
PNE Polska is operating on a national scale, while being part of an international group that contributes significantly to the energy transition. As a member of the PNE Group, our vision is a 100 percent renewable energy supply. We stand for a safe and clean power generation for the sake of generations to come. Economic, energy and environmental performance is our highest concern in the conception and implementation of our projects.
In order to advance the energy revolution, far-sightedness and forward-looking planning work are required. We have therefore developed into a Clean Energy Solutions Provider. In addition to wind energy, the company's portfolio includes photovoltaics, energy storage and power-to-X technology with a focus on hydrogen.
We shape the future – together, as a team and as a group. This is the only way to achieve the vision of a 100 percent renewable energy supply.
The PNE Polska team
From land to operation: full-scope RES development
The PNE Polska team consists of several dozen experts from various fields, covering all aspects of RES projects. Thanks to this, we are able to independently carry out wind and photovoltaic investments from land contracting through planning procedures, obtaining environmental decisions and building permits, financing, to construction and operation, including technical supervision.

Meet our team
Our brochures
Want to know more?
Explore our brochures for a closer look at our services, projects, and expertise in renewable energy.